Road Construction Industry

Hydrated Lime for Road Construction & Soil Stabilisation in India

IS 712 certified Ca(OH)₂ meeting NHAI and IRC specifications — trusted by road contractors and PWD projects across Rajasthan, Gujarat, Maharashtra, and pan-India.

70–85% Ca(OH)₂
Purity Range
IS 712 / IRC
Standard
Pan-India
Delivery

Why Hydrated Lime Is Essential for Road Construction in India

Hydrated lime (calcium hydroxide, Ca(OH)₂) is a critical material in road construction and soil stabilisation across India. The National Highways Authority of India (NHAI), state Public Works Departments (PWDs), and IRC specifications all recognise hydrated lime as the standard material for improving weak subgrade soils and building durable road bases.

When mixed into clay-rich subgrade soils, hydrated lime triggers two reactions: an immediate ion exchange that reduces plasticity and improves workability, followed by a long-term pozzolanic reaction that permanently strengthens the soil. The result is a stable, load-bearing subgrade that resists moisture damage and reduces pavement failures — extending road life significantly.

Road Construction Applications of Hydrated Lime

Subgrade Soil Stabilisation

Hydrated lime is mixed into weak, clay-rich subgrade soils to improve their load-bearing capacity before laying the road base. Lime reacts with clay minerals (ion exchange + pozzolanic reaction) to permanently increase CBR (California Bearing Ratio) values, reduce plasticity index, and improve compaction characteristics. NHAI and IRC specifications require IS 712 certified hydrated lime for this application.

Standard Grade (70–75%) or Industrial Grade (80–85%)

Sub-base & Base Course Stabilisation

Lime-treated sub-base layers provide a stable platform for bituminous or concrete pavement layers. Lime stabilisation reduces moisture susceptibility, prevents frost heave, and improves the long-term structural performance of the road. Used extensively in NHAI four-laning and expressway projects.

Industrial Grade (80–85%)

Lime-Fly Ash (LFA) Stabilisation

Hydrated lime combined with fly ash (from thermal power plants) creates a highly effective stabilising mixture for weak soils. The lime activates the pozzolanic properties of fly ash, producing a cementitious material that significantly improves soil strength. This LFA stabilisation method is approved by IRC and widely used in road projects near thermal power stations.

Industrial Grade (80–85%)

Embankment Construction

For road embankments built on soft, expansive, or waterlogged soils, hydrated lime treatment of the fill material improves compaction, reduces settlement, and prevents embankment failure. Lime-treated embankments are more stable and require less maintenance over the road's service life.

Standard Grade (70–75%)

Pavement Recycling (Cold In-Place Recycling)

In road rehabilitation projects, hydrated lime is used in cold in-place recycling (CIR) to stabilise the reclaimed asphalt pavement (RAP) material. Lime improves the binding properties of the recycled material, enabling cost-effective road rehabilitation without full reconstruction.

Industrial Grade (80–85%)

Recommended Grades for Road Construction

ApplicationRecommended Grade
Subgrade soil stabilisation (NHAI/PWD)Standard (70–75%) or Industrial (80–85%)
Sub-base stabilisationIndustrial (80–85%)
Lime-fly ash (LFA) stabilisationIndustrial (80–85%)
Embankment fill treatmentStandard (70–75%)
Cold in-place recycling (CIR)Industrial (80–85%)

Why Road Contractors Choose Shree Ram Lime

IS 712 Certified — NHAI Compliant

Our hydrated lime meets IS 712 (BIS) specifications required by NHAI, IRC, and state PWD projects. Test certificates provided with every shipment for project documentation.

Consistent Fineness

Fine particle size meeting IS 712 sieve requirements ensures uniform mixing with soil and complete pozzolanic reaction — critical for achieving specified CBR values.

Bulk Supply for Large Projects

Road projects require large, consistent quantities. We supply 15 MT to 500+ MT per month with reliable delivery schedules to match your project timeline.

Pan-India Delivery

From our plant in Pipar City, Jodhpur, we supply to road projects across Rajasthan, Gujarat, Maharashtra, Madhya Pradesh, Uttar Pradesh, Punjab, and beyond.

Competitive Project Pricing

Direct manufacturer pricing — no middlemen. Volume discounts available for large project requirements. Transparent quotes with freight and delivery timeline.

Technical Support

Our team can advise on lime dosage rates, mixing procedures, and curing requirements for your specific soil type and project specification.

Frequently Asked Questions

Get Bulk Hydrated Lime for Your Road Project

Share your project specification, monthly quantity, and delivery location. We respond within 2 hours with a detailed price quote.